From SmartHubs
Line 14: | Line 14: | ||
|type=central-urban | |type=central-urban | ||
|status=ongoing | |status=ongoing | ||
+ | |operation-start=2006 | ||
+ | |has-network=No | ||
|country=France | |country=France | ||
|city=Lille | |city=Lille | ||
|coordinates=50.63685, 3.07053 | |coordinates=50.63685, 3.07053 | ||
− | | | + | |pt-services=1, 2, 3, 4 |
+ | |s-carsharing=2 | ||
+ | |s-bikesharing=2 | ||
+ | |s-kickscootersharing=2 | ||
+ | |s-taxi=2 | ||
+ | |s-carpooling=2 | ||
+ | |mobility-related-services=1, 4, 6 | ||
+ | |other-services=2, 5, 6 | ||
+ | |info-logo=Yes | ||
+ | |info-pillar=Yes | ||
+ | |info-wayfinding=No | ||
+ | |info-conflicts=No | ||
+ | |info-assistance=No | ||
+ | |info-placemaking=No | ||
+ | |inclusion-minimum=No | ||
+ | |inclusion-universal=No | ||
+ | |planner-planning=No | ||
+ | |planner-maas=No | ||
+ | |planner-bundle=No | ||
+ | |planner-policies=No | ||
+ | |planner-intuitive=No | ||
+ | |planner-analogue=No | ||
+ | |participation=No | ||
|operators={{semorg-operator | |operators={{semorg-operator | ||
|name=SCNF "Société nationale des chemins de fer français" | |name=SCNF "Société nationale des chemins de fer français" |
Latest revision as of 09:43, 5 January 2023
Typology
central urban hub (a large hub in the city center, e.g. railway station)
Status
ongoing
Short Description
One of the two mobility hubs of the "Euraflandres" interchange project.
Major train station becoming part of an interchange project of two mobility hubs.
How to adapt existing major train station to become proper mobility hubs.
User convenient and integrated real-time information: details on schedule and departure are also provided in surrounding services: metro station, restaurants, coffee shops.
The design planning included the improvement of streets, green spaces and addition of pavements textures.
Examples of integrated tickets ("Pass Pass") and convenient purchasing ways in retails at the hub.
Operation Start (Year)
2006
Location
Lille, France
Physical Integration
Level 0
Definition 0 (No physical integration): One shared transport mode, not at walking distance to public transport, no integration between the modes. No universal design criteria are considered
There is no enough information to ensure no conflict to reach level 4. Based on their online information, the following are applicable regarding the built environment and universal design:
Equitable Use Perceptible Information Tolerance for Error
Low Physical EffortDigital Integration
Level 0
Definition 0 (No digital integration): No digital integration of shared and public transport mode options offered at the hub. There are separate services and platforms for each mode. No universal design criteria are required
Integration of booking and payment is only possible for public transport and not for shared modes. However, information about the different modes is provided.
Democratic Integration
Level 0
Definition 0 (No involvement): No involvement or consideration of stakeholder interests and user needs.
Services
4 PT services:
bus
train
metro
tram
5 shared services:
Carsharing
Bike sharing
Step/kick scooter sharing
Taxi
Carpooling
3 mobility-related services:
Parking for private two wheeler vehicles
eCharging
Self-service bike repair station
3 other services:
Waiting Rooms
Wi-Fi
Shopping
Information, Visibility and Branding
logo or branding
information pillar/display (with information on using the services)