From SmartHubs
Jump to: navigation, search
 
(12 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
{{semorg-hub
 
{{semorg-hub
|name=Point mobilité Ottignies
+
|name=Mobipoint Ottignies Gare SNCB
|description=Future hub situated next to an existing train station.
+
|description=Future hub situated next to an existing train station, planned for opening in 2023.
 
|type=central-urban
 
|type=central-urban
 
|status=planned
 
|status=planned
|network=Networks/10
+
|has-network=Yes
 +
|network=Mobipoint
 
|country=Belgium
 
|country=Belgium
|city=Ottignies
+
|city=Ottignies-Louvain-la-Neuve
 
|coordinates=50.67311, 4.56956
 
|coordinates=50.67311, 4.56956
 +
|initiation=government initiated
 +
|pt-services=1, 2
 +
|s-carsharing=2, 3, 4
 +
|s-taxi=2, 3, 4
 +
|mobility-related-services=1, 2, 3
 +
|other-services=2, 6, 7
 +
|info-logo=Yes
 +
|info-pillar=Yes
 +
|info-wayfinding=No
 +
|info-conflicts=No
 +
|info-assistance=No
 +
|info-placemaking=No
 +
|inclusion-minimum=No
 +
|inclusion-universal=No
 +
|planner-planning=No
 +
|planner-maas=No
 +
|planner-bundle=No
 +
|planner-policies=No
 +
|planner-intuitive=No
 +
|planner-analogue=Yes
 +
|participation=No
 
|operation-text=Created by the region of Wallonia (Autorité organisatrice du Transport), in collaboration with Mpact within the eHubs project.
 
|operation-text=Created by the region of Wallonia (Autorité organisatrice du Transport), in collaboration with Mpact within the eHubs project.
 
|physical-integration-level=unknown
 
|physical-integration-level=unknown
 
|digital-integration-level=unknown
 
|digital-integration-level=unknown
|social-integration-level=unknown
+
|democratic-integration-level=unknown
 
|modes={{semorg-hub-mode
 
|modes={{semorg-hub-mode
 
|mode=Hub_Property:Modes/2
 
|mode=Hub_Property:Modes/2
Line 17: Line 39:
 
|electrified=unknown
 
|electrified=unknown
 
}}
 
}}
|project-research=Research Projects/4
+
|project-research=eHUBS
 +
|levels-checked=Yes
 
}}
 
}}

Latest revision as of 09:31, 16 January 2023

HUB
Mobipoint Ottignies Gare SNCB
Typology
central urban hub (a large hub in the city center, e.g. railway station)
Status

planned

Short Description

Future hub situated next to an existing train station, planned for opening in 2023.

Location
Ottignies-Louvain-la-Neuve, Belgium
Loading map...
Networks
Physical Integration
Level 0
Definition 0 (No physical integration): One shared transport mode, not at walking distance to public transport, no integration between the modes. No universal design criteria are considered
Digital Integration
Level 0
Definition 0 (No digital integration): No digital integration of shared and public transport mode options offered at the hub. There are separate services and platforms for each mode. No universal design criteria are required
Democratic Integration
Level 0
Definition 0 (No involvement): No involvement or consideration of stakeholder interests and user needs.
Initiation of the hub

government initiated

Services
2 PT services:
bus
train
2 shared services:
Carsharing
Taxi
3 mobility-related services:
Parking for private two wheeler vehicles
Parking for private cars
Multi-functional strip (e.g. Kiss & Ride, loading zone)
3 other services:
Waiting Rooms
Shopping
Cafe / restaurant
Information, Visibility and Branding
logo or branding
information pillar/display (with information on using the services)
Planner app
Analogue, on-site booking alternatives are available for all modes.
Research Projects